References
Date |
Location |
Company |
Position |
Description |
December 2017-date |
Bonaire, Dutch Caribbean |
AECOM/WWC
|
Team Leader |
Technical Assistance to the Government of Bonaire for the implementation of the 10th EDF Programme: Belnem/Hato Sewerage and Sanitation Project: 5 km sewage vacuum network, OD 75-250 mm; 1 vacuum station, WWTP and sludge treatment optimization |
July 2016-July 2017 |
Serbia |
GeoTest/WWC Aguado Javier |
Engineer - FIDIC |
TA to EUD- Supervision and monitoring of design and Construction and commissioning of the Waste Water Treatment Plants (sludge treatment) and drainage at Thermal Power Plant Nikola Tesla A, Serbia |
April 2006-date |
Terneuzen, the Netherlands |
WWC Water and Wastewater Holding BV DBT Jaksic
|
Project manager, Senior water engineer
|
Project management comprising: studies, CBA, design: incl. process, civil and electro-mechanical equipment, tender documents, procurement, contracting, subcontracting control, start up and commissioning, project audit: evaluation and assessment; FIDIC, UAV, PRAG. Preparation of project proposals & techno-economical documentation: budget estimates and financing applications: wastewater, industrial- and drinking-water projects incl. (pre)feasibility studies, technical studies, design &. design control for commercial and by EU subsidized (waste)water projects; International project team recruting, leading and coordination; Developing optimal technological & technical solutions for urban and industrial water& wastewater systems and sludge treatment. R&D: Development & promotion of new sludge treatment technologies; Guest lecturer UNESCO-IHE: industrial (waste)water treatment. |
February 2016 - August 2016 |
Turkey/ The Netherlands |
TiEG/WWC Hugo Ruiz / Pere Nogués Martin pere.nogues.martin@gmail.com ruiz@taseuro.com |
Tem leader- Resident Engineer -FIDIC |
Technical Assistance to EUD- Bartin, Turkey wastewater project: Bartin: Supervision of design and construction of WWTP Bartin, inclusive PS and sludge treatment. Inkumu: Extension of sewer network for ca. 8000 m D=150-500mm, ca. 640 manholes, and Sewage pump station, wastewater pre-treatment, air treatment and installation of offshore HDPE pipeline -ca. 1500m, D=315mm, for deep sea outfall. |
November 2014-Decmber 2015 |
Macedonia/ The Netherlands |
Eti/WWC Radmila Stanisavljevic radmila@eti-consulting.net |
Team leader |
TA to EUD The preparation of the feasibility study, CBA, (FIDIC red and yellow book) design and tender documentation for upgrading the WWTP in Vranishta, extension of the collector system for Ohrid Lake and separation of the foul and storm priority water network in the Cities of Ohrid and Struga |
August 2013-February 2014 |
Guyana, Bonaire, Curacao, The Netherlands |
European Commission, Safege/WWC |
Team leader |
TA to EUD-Bonaire Sewerage and Sanitation System. Client- CA: Delegation of EU in Guyana, Surinam.: Bonaire, the Netherlands. Technical Audit of design of sewerage and WWTP, procurement, works and service contract, according to PRAG. Key figures: 33 km sewage vacuum network, OD 75-250 mm; 4 vacuum stations, 14,3 km pressure sewage network, OD 110-160 mm; SBR communal WWTP, 20.000 p.e.; RSF and UV effluent polishing for irrigation. EDF project executed according PRAG contract conditions. Investment 27 Million Euro |
May 2014-December 2105 |
The Netherlands |
Fleming Europe/ WWC Igor Kottman Igor.kottman@flemingeurope.com
|
Senior sludge treatment expert |
Sludge treatment training preparation incl. novel sludge technology for sludge minimisation |
March 2013-date |
The Netherlands |
RUBIKIN/ WS V&V/ WWC / Danielle Simons, d.simons@rubikin-europe.com |
Team leader - Senior expert |
Feasibility of different Sludge treatment technology: Consultant for the examination of novel sludge separation technology by Dutch Waterboard Vallei &Veluwe. |
May –June 2013 |
The Netherlands/ Serbia |
WWC/Redox/ Godes Dejan Seman |
Project manager |
Wastewater treatment plant for food industry. Project management. Preparation of feasibility study, design control and tender documents for Turn Key project offer. |
February-December 2012 |
The Netherlands |
Shell /WWC / Koen de Leeuw, koen.deleeuw@shell.com
|
Senior wastewater expert |
Review of project tender documents: Feasibility of MBR WWTP, design & engineering control; assistance in tender preparation; Advanced H2S removal from wastewater; Consultant for examination of new (waste)water treatment technologies. |
September 2011- February 2012-07-02 |
Slovenia |
WWC / FMC- Foret Francisco Montero |
Project manager |
ECOLAB Consultancy incl. lab and pilot research for treatment of laboratory wastewater. Target removal of complex AOX. |
December 2011-December 2012 |
Croatia |
WWC/ Acciona Ingenieria Irina Yurievna irina.yurievna.yakimchuk@acciona.es |
Technical expert |
TA to EUD-Water Supply and Sewerage Improvements and Construction of a Wastewater Treatment Plant in the Municipality of Knin” – Human resources Development: incl. trainings: FIDIC, PRAG, Project cycles management applications, hands-on-job wastewater treatment training, GIS application, MIS development. Capacity building: improvement of all work processes and organization structure within JKP Knin. Key figures: Water supply network ca. 21km; sewerage network ca.22km; 4 pumping stations, drainage reconstruction 3,6km; WWTP 20.000 PE . Investment 15,7 million Euro |
September 2011-September 2013 |
Montenegro |
WWC/ Agreco / Alternative consulting d.o.o./ Radmila Stanisavljevic: |
Team Leader |
TA to EUD- Preliminary design for the construction of WWTP(execution follows FIDIC Yellow Book) and sewerage network (FIDIC red Book) in the Municipality of Berane, TA to EU delegation in Montenegro. Feasibility study analysis. Preliminary design for the construction of sewage WWTP (execution follows FIDIC Yellow Book) and sewerage network (FIDIC red Book) in the Municipality of Berane, TA to EU delegation in Montenegro.Sewerage design: By gravity: 22.974m, Pipe diameters 250-800mm; PS, Pressure sewerage: 310m Pipe diameters 160-315 mm. Drainage design: By gravity: 12.810m Pipe diameters 250-1300mm.SBR WWTP design: 1.st phase 20.000 p.e.; 2nd phase 27.000 p.e.. Investment: sewerage 3 millions euro, WWTP 3,2 millions Euro |
July – September 2011 |
Turkey |
WWC/Colsen Joop Colsen J.Colsen@Colsen.nl |
Project manager / Sales manager |
Consulting project management for Pinar diary wastewater treatment plant retrofit. |
March 2011-date |
Belgium |
WWC / FMC- Foret Francisco Montero |
Project manager |
Janssen Pharmaceutical Company: Consultancy and lab research for treatment of pharmaceutical wastewater. Target removal of ibuprofen and AOX, Belgium (on going). |
March – May 2011 |
Belgium |
WWC Info@w-w-c.eu Wouter Jansen |
Project manager / Senior expert |
Van Loon Group ATC-Tank Cleaning: Quick scan of existing WWTP plant and treatment optimisation, Antwerpen, Belgium. |
October 2010 -May 2011 |
Slovenia |
WWC/FMC/Drava/STRABAG Francisco Montero |
Project manager |
CERO Ljubljana, turn key offer for effluent treatment of MB Mechanical Biological solid waste treatment plant, Slovenia.
|
July 2010 December 2011 |
Croatia |
WWC/Proning Vlatka Lipošćak |
Senior wastewater expert |
Inland Water Project: Development and Application of Models and Guidelines to facilitate decision making in the Extension of Wastewater Treatment Plants (WWTPs) and to Increase Operational Efficiency of Existing WWTPs. Client: Croatian Waters. Master plan inventory of the performance of 9 communal WWTP & sludge treatment; Design retrofit of 3 existing secondary communal wastewater plants with help of ASM Bio-Win computer modelling, preliminary design of tertiary biological communal wastewater treatment and preparation of design guidelines. Design capacities of covered WWTPs: Zagreb 1,200.000 pe; Belisce 240.000 pe; Bjelovar 50.000pe; Cakovec 91.000 pe; Daruvar 23.000 pe; Koprivnica 100.000 pe; Varazdin 140.000 pe; Velika Gorica 35.000 pe; Vinkovci 43.000 pe;. |
March 2010-date |
Serbia |
WWC/FMC Francisco Montero |